Building a deck can be a rewarding addition to your home, but how long does it actually take? The timeline for deck construction depends on various factors, including design complexity, material choices, and weather conditions. Let’s break down the typical process to help you plan better.

1. Planning, Design, and Permitting

The process starts with planning and design, which usually takes around 1-2 weeks. This is when you’ll finalize your design with your deck builders Boise ID and choose materials that suit both your style and budget. 

After the design is set, you'll need to obtain the necessary permits from your local municipality. Depending on where you live, permitting can take anywhere from a few days to 2 weeks.

Pro Tip: A well-thought-out design helps streamline the next steps and speeds up permit approval, avoiding delays in the process.

2. Site Preparation and Foundation

Once the permits are in hand, the site preparation phase begins. This usually takes 1-3 days, depending on the condition of your yard. If there’s heavy vegetation or uneven terrain, clearing and leveling may take longer. Proper site preparation is crucial for ensuring a stable foundation for your deck.

  • Groundwork: The land needs to be properly leveled to avoid structural issues down the road.

  • Site Clearing: Removing obstacles, such as rocks or trees, ensures no delays during construction.

The better prepared your site is, the faster the foundation will be laid.

3. Deck Building and Construction

The actual deck building phase typically takes 5-7 days for a simple deck and up to 2 weeks for more complex decks. During this phase, your builders will:

  • Build the Frame: The foundational structure is installed first. This includes posts, beams, and support joists to create a solid base.

  • Install Decking: The surface boards are added, followed by stairs, railings, and any custom features like lighting or built-in seating.

Pro Tip: If the weather is unfavorable, construction might be delayed, so it’s best to schedule during a mild season.

4. Finishing Touches and Clean-Up

Once the structure is in place, deck builders apply the final touches. This includes staining, sealing, and cleaning the construction site. This phase typically takes 1-2 days to complete. Sealing your deck is especially important as it provides protection against the elements, ensuring its longevity.

  • Staining and Sealing: Helps protect the wood from moisture, UV damage, and pests.

  • Clean-Up: Ensures the site is cleared of any construction debris, making your new deck ready to enjoy.

Tip: Staining and sealing your deck can also enhance its appearance, adding richness and depth to the wood.

Conclusion

On average, deck construction takes about 2-4 weeks, depending on size, design, and materials. If you're wondering how long does it take to build a custom deck in Boise ID, the process generally falls within this range. By working with experienced deck builders, you can ensure a smooth, efficient process from start to finish. You’ll be able to enjoy your new outdoor space in no time.

Ready to build your dream deck? Call Sunset Decks Idaho at (208) 739-6778 today, and get started on creating your ideal outdoor living space!

Previous
Previous

How to Make Your Deck Pet-Friendly and Safe for Your Pets

Next
Next

Avoid These Deck-Building Pitfalls: Expert Advice for a Flawless Project